13 February 2022

A few emails and lots of Carnaval preparation

  • Email to Nura to go ahead with plans/structural engineering quote of 8/2/22, with local builder required for structural aspects of work only. Initial commencement invoice should be 540€ + 21% IVA
  • Email replying to Irene at Green Electric (la Bisbal) - she may call tomorrow, will hopefully visit Tuesday
  • Email to info@ar-gam.com (who did the concrete floor at Nura; local in Mont Ras) enquiring about estimate for 60m2, 100m depth possibly 'anhidrita' concrete floor for underfloor heated main room

No comments:

Post a Comment