08 March 2022

The roof is done, the towers come down

9.30 - Xavi the lampista (insbloe@gmail.com) - contact from Nura

  • Good English
  • Suggested place up near Grau (Cortes?) to have drains scoped
  • Will quote for electricity board installation and movement of meter outside (may take 9 months) and separately heat pump
  • Suggested a small water tank to get hot water downstairs and then we're good to go (pretty much)

11.00 - take down towers

13.30 - emails to irene @greenelectric

  • try to move the solar panels along a bit. Trying to get the price (10 panels east side of roof) down to 7500€

14.30 - 2 emails to Xavi

  • Electrics with plans
  • heating with room sizes (m³) to calculate size of fan coils required