22 September 2022

Meeting with Albert, Marc and Xavi

Marc will quote 
    • opening front
    • opening back
    • hourly rate
  • Any other 'major' works he will quote separate
  • Needs to dispose of at least one load of rubble (for taxes) but rest we can take to the dump
Xavi will send
  • Wiring diagram of what wires need to go where to come next week
  • 3.6kW on towel rail fuse means only 2 bathrooms on each fuse
  • bathroom fans and (humidity) sockets on separate circuit for all bathrooms
  • Xavi described fan coils as 'noisy'
  • Three boxes in garage - indoor part of aerotermia, DHW, expansion tank?
  • Meter will remain where it is, black box will be changed, other fuse boxes will be removed, triphase to monophase
  • Ventilation from bathrooms to go out roof; two bathrooms can join into one tubo out roof
  • Ventilation required from downstairs bathroom - 110mm PVC pipe
  •  