  • We have a new main ECB, connected (for now) to the existing supply at the east side of the house - the plan long-term is to move where the supply enters the building (we need to have a meter on the outside of the house anyway) but that requires endesa to come out and the street may need to be closed, and that's a long term project
  • Xavi's colleague eventually turned up to finish installing it two weeks after he was supposed to - 25/7/22. It's done - and he hasn't invoiced us for it yet, more than a week later...
  • Washing machine and (temporary) boiler are on one 16A CB - we also have 16A for downstairs sockets (only living room ATM), 16A for upstairs (only one socket in the NE bedroom under the window, from which an extension lead runs to E&F's room for the fan / iMac), 10A for downstairs lights (bathroom and living room ATM) and we've run a 1.5mm cable up for lights upstairs - on the to-do list - and there's a 10A CB for that
  • We bought a 2 ring induction hob (we ran out of gas for the camping stove and failed to find a way to refill / replace the gas canister) -  works well - yet to see this month's leccy bill though...
  • Tubo went in for the solar panels today - John has emailed Green Electric to let them know - I'm very much looking forward to the panels going in
  • Movistar technician is due tomorrow to try and get our fibre internet in - the router arrived but it's not much good without a line coming into the building! 4G has been OK, but 25GB (my vodafone quota, which I'm running on the mifi router) is not enough for a month and it's patchy. Also the wifi doesn't seem to stretch to the front of the house so we're gonna need some repeaters (not unexpected)